Skip to content
Tala Hagras

Project 02 · Architecture as Music

Music Institution

Reading, UK

A music institution conceived as an architecture of rhythm, resonance and movement. A circular performance space anchors the project while landscaped routes connect the city to the canal.

Still of the interpretive 3D study of the Music Institution: a glazed drum with a planted roof and central skylight, a slatted annexe and curved terraces stepping to a canal.

0% assembled → 100% separated. Lifts the roof and upper ring as in Tala’s exploded axonometric so the hall and its seating can be read.

Points of interest

Interpretive 3D study based on the portfolio drawings

Built from the site plan, section, exploded axonometric and renders on portfolio pages 3–7. The drum, its stepped hall, the mezzanine, the roof garden with its skylight and the terraces to the canal are modelled to the level those drawings support. Interiors beyond the section and axonometric are not modelled.

  • Scale is proportional: the drum diameter and storey heights are read from the section and axonometric; no dimensions are stated.
  • The outdoor terraces follow the curved bands on the site plan; their exact number of steps is not drawn.
  • The timber-slatted annexe and the curved outdoor performance screen are taken from the render and axonometric; their construction is not detailed in the source.
  • The section view cuts the model through the centre of the hall; the paired drawing is Tala’s own section, which remains the authoritative description of the interior.

Based on: portfolio p.4 (site plan); portfolio p.5 (section and exploded axonometric); portfolio p.7 (renders and model photographs)

Site
Reading, UK — a canal-side site
Portfolio, p.3
Type
Music institution with a circular performance space
Portfolio, p.3
Spaces
Recording studios, double-height performance space with stepped seating, café, mezzanine, practice music and dance rooms, rooftop garden
Portfolio, p.5
Status
Academic design project
Portfolio, p.1

01

Concept and atmosphere

The design statement sets the building out as an instrument: rhythm in the repetition of its structure, resonance in the circular hall, movement in the routes that pass through and around it. The circular performance space anchors the project while landscaped routes connect the city to the canal.

Source: Portfolio, p.3

Dusk render of a circular two-storey music hall with a wide ring roof, glazed façades and figures on stepped terraces beside a reflecting pool.

External perspective of the Music Institution at dusk: the circular performance hall above a stepped landscape descending towards the water.

Render by Tala HagrasPortfolio, p.3Crop

Exploded isometric sketch of a circular music building: a ring of rooms around a central void above a performance hall with curved raked seating.

Concept sketch: an exploded isometric of the circular building, the ring of rooms lifted above the performance hall.

Drawing by Tala HagrasPortfolio, p.3CropSource supplied at low resolution

Hand-drawn flowing parallel lines like a curved musical stave, with a pair of quavers.

Concept board motif: flowing lines translate the movement of the canal into the paths through the building.

Drawing by Tala HagrasPortfolio, p.3CropSource supplied at low resolution

02

Reading the site: public realm

The building is positioned within a stepped landscape, with the canal edge becoming a space for gathering, movement and performance. The site plan places the drum at the north-east of the site and sweeps curved, stepped terraces from it down to the water, with outdoor performance areas and planted circles set among the trees.

Source: Portfolio, p.4

Site plan of the Music Institution, Reading: a circular building among trees, with curved stepped terraces descending to a canal crossing the site diagonally.

Site plan: the circular hall set within a stepped landscape of terraces and trees descending to the canal edge. No scale is stated in the source.

Drawing by Tala HagrasPortfolio, p.4Original

Site analysis collage: hand-drawn street plan with the site in red, graffiti walls, black-and-white weir photographs and people walking beside the canal.

Site analysis collage, layering a hand-drawn plan of the canal-side site with the graffiti, weirs and movement of people found along the water.

Collage by Tala HagrasPortfolio, p.4CropThe photographs within the collage are site documentation whose authorship is not stated in the portfolio.

03

Section: movement and levels

A continuous spatial sequence links practice, performance and the public landscape. The section cuts through recording studios, the double-height performance space with its stepped seating, the café and the mezzanine hallway, under an extensive green roof; outside, the stepped seating continues down towards the canal. Its construction legend (CT01–CT20) records CLT panels, acoustic panelling, sound and thermal layers, the green-roof build-up and the ground slab.

The exploded axonometric separates the ground ring (entrance and registry, recording studio, kitchen, bathroom), the upper ring (mezzanine round hall, practice music and dance rooms) and the rooftop garden with its skylight.

Source: Portfolio, p.5

Long section through the Music Institution: recording studio, double-height performance hall with stepped seating, cafe and dance studio under planted roofs.

Long section: recording studios, the double-height performance space with its stepped seating, the café and the dance studio beneath planted roofs, and the outdoor stepped landscape. Labels SU01– and CT01– are keyed to the legends on the sheet.

Drawing by Tala HagrasPortfolio, p.5Crop

Section detail: double-height performance space with dancers, mezzanine above, cafe and first-floor dance studio under a green roof.

Detail of the section through the performance space, with the mezzanine hallway above and the café and dance studio alongside.

Drawing by Tala HagrasPortfolio, p.5CropSource supplied at low resolution

Construction legend CT01 to CT20 from the section: CLT panel, vapour control membrane, rigid insulation, extensive green roof planting, drainage barrier, acoustic panelling, plywood, sound and thermal layers, ventilation gap, finishes, hardcore, screed, damp-proof membrane, concrete slab.

Construction legend CT01–CT20 from the section sheet.

Drawing by Tala HagrasPortfolio, p.5CropSource supplied at low resolution

Exploded axonometric of the circular music building: roof with skylight, upper ring of practice rooms and ground floor with performance hall, in its site.

Exploded axonometric: the rooftop garden and skylight, the mezzanine ring of practice rooms and the ground floor with the performance hall, café and outdoor stepped seating, separated above the site (legend SU01–SU14).

Drawing by Tala HagrasPortfolio, p.5Crop

04

Material, assembly and technical study

Structural thinking, timber connection studies and physical model-making are presented as essential evidence of design development. The material study proposes reusing reclaimed glulam, with the ABBA Arena cited as a precedent; timber connection details and a 1:20 tectonic model work out the joints, and a 1:200 site model and a section model test the whole.

Source: Portfolio, p.6

Construction technology drawing: a legend of fourteen build-up layers, circular details of a green-roof edge and a wall junction, and a cutaway of a music room.

Construction technology study: build-up details of the green-roof edge and the wall-to-floor junction, keyed to a cutaway through a practice room.

Drawing by Tala HagrasPortfolio, p.6Original

Four photographs of a laser-cut timber model of a branching tree-like column with angled arms and white card infills, against a white wall.

Timber connection study: a laser-cut model of the branching column whose angled arms carry the roof structure. The sheet cites reclaimed glulam from the ABBA Arena as a precedent; those photographs are not reproduced.

Model and photograph by Tala HagrasPortfolio, p.6Crop

Photograph of a 1:20 tectonic model: a laser-cut timber column branching into angled arms with white card infills beneath a white roof board.

The 1:20 tectonic model of the branching timber column that supports the roof of the Music Institution.

Model and photograph by Tala HagrasPortfolio, p.6CropSource supplied at low resolution

Wide view of the 1:200 site model: curved stacked plywood terraces sweep past slatted landscape elements and dried-flower trees to a white hall.

The 1:200 site model, with the stacked plywood terraces sweeping between the landscape elements and the circular hall.

Model and photograph by Tala HagrasPortfolio, p.6Crop

Photograph of the 1:200 site model from above: a white cylindrical hall, curved slatted elements and dried-flower trees on a plywood base.

The 1:200 site model seen from above, showing the circular hall and the curved landscape elements across the engraved site base.

Model and photograph by Tala HagrasPortfolio, p.6CropSource supplied at low resolution

Two white 3D-printed section-model pieces: a curved wall segment with window openings and a curved tier of stepped seating.

Section model of the Music Institution's circular hall: a curved wall segment with openings and a tier of stepped seating.

Model and photograph by Tala HagrasPortfolio, p.6CropSource supplied at low resolution

05

Architectural atmosphere

Theatrical experience is not an effect added to the project: it emerges from movement, light, scale and the shared experience of sound. The renders show the drum at dusk above the terraces and the water, and the hall inside lit from its skylight.

Source: Portfolio, p.7

Interior render of a circular double-height hall lit from a skylight, with silhouette musicians on a curved stage and an audience in front.

Inside the circular performance hall, where a mezzanine ring overlooks musicians playing beneath the central skylight.

Render by Tala HagrasPortfolio, p.7CropSource supplied at low resolution